Box-in-box is a construction technique that allows a space within a space to be insulated against unwanted extraneous noise and vibration. Such extraneous noise may be airborne (travelling through the air) or they may be structure-borne – travelling through the ground and building structure. These noises can be generated by cars, trains, aircraft or even people or music in adjacent rooms.
Box-in-box is an acoustic isolation technique that has proved effective in keeping out distracting noise, hence its widespread use in theatres, cinemas, recording studios and other instances where it is imperative to have as-near silence as possible.
As the name suggests, the technique involves constructing a room within a room (which may be the building structure), so that the inner room is acoustically isolated from the outer. This will involve isolating the walls, floors and ceiling of the inner box and using resilient mountings to achieve this.
[edit] Three main elements
Vibration control and acoustic floor systems specialist Mason UK Ltd identifies three main elements to achieving an effective box-in-box construction:
[edit] Floating acoustic floors
Floors are regarded as one of the most important elements of a sound insulated construction and are generally floated to achieve the requisite acoustic isolation. Typically, new floors will be constructed using concrete and rest on either springs or elastomeric bearings. This means that crucially, an air gap of up to 200mm is created between the old floor and the new. Where a lighter weight system is required, timber floating floors can be specified.
[edit] Acoustically isolated walls
Isolated walls can either be supported on the new floor (and may have to be fixed to the external building structure with braces and acoustic wall ties) or they can be built upon specially designed wall support plates.
[edit] Acoustic hangars
An acoustic ceiling will be the final element to complete the box construction. The new ceiling plane will typically comprise acoustic tiles suspended on drop rods from hangars fixed to the existing ceiling (soffit) or to timber joists.
Even with a completed box-in-box, there may still be low levels of background noise emanating from a ventilation system. This can be minimised by mounting ventilation ducts and other building services on springs with flexible rubber connections.
[edit] Related articles on Designing Buildings Wiki
- Acoustics.
- Acoustic materials.
- Airborne sound.
- Approved document E.
- Building acoustics.
- Building regulations.
- Decibel.
- Flanking sound.
- Floating floors.
- Impact sound.
- Pre-completion sound testing.
- Reverberation.
- Reverberation time.
- Sound absorption.
- Sound insulation.
- Sound masking.
- Sound v noise.
-
[edit] External sources
Mason UK Ltd Vibration Control Products and Acoustic Floor Systems
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.